Please Choose Your Language
You are here: Home » Resources » Guides

Guides

Waste incineration installation
  • Step1
    • Garbage incineration furnace should be installed in the indoor, should level the ground before installation and install the platform on the ground.In order to repair,Incinerator sides and back should be away from the walls 1 meters.
  • Step2
    • Application of cable fastening prevent wind tilt after installation of the chimney.
  • Step3
    • Check the connection of circuit.Specification of power supply is 380v or 220v,50hz.In accordance with the requirements of the power circuit is connected, the incinerator circuit line should be grounded, prevent leakage accidents. Before starting the incinerator carefully check the wire connection.
  • Step4
    • Check the connection of the oil system.In addition to the oil inlet pipe and outlet pie of the burner is a hose,the rest of the pipeline must use copper or steel pipe.The pipe joint does not allow leakage place, if there is oil leakage situation should take timely measures to stop.
Daily maintenance of garbage incinerator
 The circuit and power supply switch should be closed when not working.
 Clean the oil filter regularly.
 Every two months to clean dust two combustion chamber
 Replace the[Ca(OH)2]regularly.
 Regular maintenance of the burner.
 Regular maintenance of fan.
Zhucheng Xinjiye Environmental Protection Equipment Co., Ltd. is engaged in the production and operation of Environmental Protection Equipment Professional Company.

Quick Links

Product Category

Contact Us
Copyright © 2024 Zhucheng Xinjiye Environmental Protection Equipment Co., Ltd. All Rights Reserved.| SitemapPrivacy Policy