Garbage incineration furnace should be installed in the indoor, should level the ground before installation and install the platform on the ground.In order to repair,Incinerator sides and back should be away from the walls 1 meters.
Step2
Application of cable fastening prevent wind tilt after installation of the chimney.
Step3
Check the connection of circuit.Specification of power supply is 380v or 220v,50hz.In accordance with the requirements of the power circuit is connected, the incinerator circuit line should be grounded, prevent leakage accidents. Before starting the incinerator carefully check the wire connection.
Step4
Check the connection of the oil system.In addition to the oil inlet pipe and outlet pie of the burner is a hose,the rest of the pipeline must use copper or steel pipe.The pipe joint does not allow leakage place, if there is oil leakage situation should take timely measures to stop.
Daily maintenance of garbage incinerator
The circuit and power supply switch should be closed when not working. Clean the oil filter regularly. Every two months to clean dust two combustion chamber
Replace the[Ca(OH)2]regularly. Regular maintenance of the burner. Regular maintenance of fan.